Building Renovation And Renovation
Many historical buildings lose their original function due to the changing life style and the demands related to it, and are adapted to serve a different function from the original purpose. Buildings, whose functions such as apartments and hotels are still valid today, are far from offering the comfort conditions of the similar ones built today, and thus become substandard by functional obsolescence, and when not updated, they are abandoned and destroyed. Re-functioning is important to save old buildings from demolition
Building Renovation or Renovation Management Service Includes:
Makes Negotiations and Applications with Administrations for Modification Permits, Provides
Coordination.
- Before a Comprehensive Renovation or Renovation Investment, the Building’s Performance Analysis is Performed and its Static Resistance is Verified. As a result of the investigation:
- a) If the Performance Analysis of the Structural System of the Building is Weak According to the Current Earthquake Code, It Provides the Analysis of the Options for Reducing the Cost of Comprehensive
Renovation or Renovation or Not Bearing This Cost.
- b) If the Building Needs Reinforcement, First, it Prepares Reinforcement Projects and applies for a Reinforcement License. By having the Work Discovered, Receives Subcontractor Bids, Selects and
Contracts, Site Delivery, Coordination in the Field, Solving Problems, Controlling the Conformity of the Manufacturing to the Project and Receiving the Completed Works.
- c) If there is no need for reinforcement or after reinforcement, it transfers the floor plans to the computer by taking the surveys of the building (Dimensions of the Locations, Locations and Dimensions of the Carrier System, Installation Lines and Locations). Meanwhile;
- It questions the Investor’s Expectation from the Building with its Construction, Project and Real
Estate Valuation Experiences and makes analyzes for the long-term use of the building according to its current state.
- After Deciding on Expectations, Materials and System Options are Examined While Preparing the Architectural Project. Accordingly, Interior Designs and 3D Modeling are prepared. After the Decisions are matured and approved, Architectural, Electrical and MechanicalApplication Projects are Prepared.
iii. It Prepares the Job Discovery through Application Projects, Receives Subcontractor Offers, Selects
and Contracts, Site Delivery, Coordination in the Field, Solving Problems, Controlling the Conformity of
the Productions to the Project and Receiving the Completed Works while Protecting them.